Wednesday, 14 December 2011

Production Schedule

Wk 13- Complete initial found footage locating and determine where to position the self-generated material. Complete full storyboard and clip-chain structure.

Wk14- Begin editing the footage into the structure of the film, using storyboards to fill the gaps left by footage still to be shot. Shoot initial viewer scenes- 1 actor required, fig rig, tripod, handi and standard cams.

Wk15- Shoot fake Edward Deaux documentary scene- 1 cameraman required. Location to be determined, probably either just outside St Matts or other exterior location.

Wk16- Edit in viewer scenes to complete basic structure, finish scripting the last segments to shoot & organise the Cop Show segment on Frenchay.

Wk 17- Shoot Cop Show segment- 2 actors required, plus flat location on Frenchay Campus. Will require standard camera & tripod.

Wk 18- Edit in Cop Show segment, plan internet reviewer segment, location likely to be on campus in St Matts, with sheet as background and visible screen.

Wk 19- Shoot internet reviewer segment- 1 actor required, tripod, cam & lighting kit, edit in reviewer segment.

Wk 21- Editing. Total structure of film should be in place by this point, no additional material required.

Wk 22- Polish, add credits & final editing

Wk 23- Finish